DEMOLITION PROJECT: ADDLESTONE - HIGH STREET
PROJECT OVERVIEW
Six former retail units with accommodation, including two houses. Specialist skills required for a techinical cut away from neighbouring property.
Full package comprising of:
- Carry out pre demolition surveys
- Application of Section 81
- Risk assessment
- Planning, including 3d phased method statements
- To carry out full soft strip
- Full scaffolding
- Full demolition
- Crashing material on site Pile mat installation
- Reduce level excavation Cut & Carve
- Asbestos removal
SUSTAINABILITY STATISTICS
- 100% of wood recycled
- 97% of construction & demolition waste
- 100% 1,500 tonne crushed 6F5 material – this was used on site for piling mat construction
- 100% 14 tonne, metal
- 97% total all materials recycled
KEY ACHIEVEMENTS
- Working and liaising with local residence to avoid disruption
- Detailed Traffic management plan put into place to minimize disruption to local infrastructure
- Local authority Deadline requirement
- Working under Covid 19 restrictions to protect the safety of visitors and Charlton group staff
- Category
- ClientO&D Construction
- StartAugust 10, 2020
- EndSeptember 08, 2020

Related Project
Full asbestos removal, full Demolition and site clearance, removal of foundation and all materials…
Full demolition, recycle and earthworks on former equestrian centre.
Strip out and recycling, including specialist removal of a cold store and storage racking…
Strip out, 10 office floors and 4 double shop floor units. Working with the…
Former Technical College, soft strip, internal demolition, including mezzanine floors, lifts, office blocks.
Full demolition and recycling of former teaching block.