ADDLESTONE HIGH STREET

DEMOLITION PROJECT: ADDLESTONE - HIGH STREET

PROJECT OVERVIEW

Six former retail units with accommodation, including two houses. Specialist skills required for a techinical cut away from neighbouring property.

Full package comprising of:

  • Carry out pre demolition surveys
  • Application of Section 81
  • Risk assessment
  • Planning, including 3d phased method statements
  • To carry out full soft strip
  • Full scaffolding
  • Full demolition
  • Crashing material on site Pile mat installation
  • Reduce level excavation Cut & Carve
  • Asbestos removal



SUSTAINABILITY STATISTICS

  • 100% of wood recycled
  • 97% of construction & demolition waste
  • 100% 1,500 tonne crushed 6F5 material – this was used on site for piling mat construction
  • 100% 14 tonne, metal
  • 97% total all materials recycled



KEY ACHIEVEMENTS

  • Working and liaising with local residence to avoid disruption
  • Detailed Traffic management plan put into place to minimize disruption to local infrastructure
  • Local authority Deadline requirement
  • Working under Covid 19 restrictions to protect the safety of visitors and Charlton group staff

  • Category
  • ClientO&D Construction
  • StartAugust 10, 2020
  • EndSeptember 08, 2020