DEMOLITION PROJECT: FARNBOROUGH - TECHNICAL COLLEGE
PROJECT OVERVIEW
Full demolition and recycling of former teaching block.
Full package comprising of:
- Carry out pre demolition surveys
- Application of Section 81
- Risk assessment
- Planning, including 3d phased method statements
- To carry out full soft strip
- Full scaffolding
- Full demolition
- Reduce level excavation Cut & Carve
- Asbestos removal
SUSTAINABILITY STATISTICS
- 100% of wood recycled
- 96% of construction & demolition waste 100% 1,500 tonne 6F5 material
- 100% 75 tonne, metal
- 96% total all materials recycled
KEY ACHIEVEMENTS
- Working and liaising with local residence to avoid disruption, due to high volume high street location
- Detailed Traffic management plan put into place to minimize disruption to local infrastructure
- Local authority Deadline requirement
- Working under Covid 19 restrictions to protect the safety of visitors and Charlton group staff
- Category
- ClientConcept
- StartJuly 20, 2020
- EndSeptember 29, 2020

Related Project
Full asbestos removal, full Demolition and site clearance, removal of foundation and all materials…
Strip out and recycling, including specialist removal of a cold store and storage racking…
Former Technical College, soft strip, internal demolition, including mezzanine floors, lifts, office blocks.
Full demolition, recycle and earthworks on former equestrian centre.
Six former retail units with accommodation, including two houses. Specialist skills required for a…
Strip out, 10 office floors and 4 double shop floor units. Working with the…