DEMOLITION PROJECT: SURREY
PROJECT OVERVIEW
Full demolition, recycle and earthworks on former equestrian centre.
Full package comprising of:
- Carry out pre demolition surveys
- Application of Section 81
- Risk assessment
- Planning, including 3d phased method statements
- To carry out full soft strip
- Full demolition
- Crushing material on site
- Pile mat installation
- Reduce level excavation
- Asbestos removal and contaminated ground remediation
SUSTAINABILITY STATISTICS
- 100% of wood recycled
- 99% of construction & demolition waste
- 100% 900 tonne crushed 6F5 material – this was used on site for piling mat construction
- 100% 52 tonne, metal
- 99% total all materials recycled
KEY ACHIEVEMENTS
- Working with high water table (flood plain) Working and liaising with local residence to avoid disruption
- Detailed Traffic management plan put into place to minimize disruption to local infrastructure
- Local authority Deadline requirement
- Working under Covid 19 restrictions to protect the safety of visitors and Charlton group staff
- Category
- ClientLofthouse Residences
- StartSeptember 15, 2020
- EndJanuary 08, 2021

Related Project
Six former retail units with accommodation, including two houses. Specialist skills required for a…
Full demolition and recycling of former teaching block.
Full asbestos removal, full Demolition and site clearance, removal of foundation and all materials…
Strip out, 10 office floors and 4 double shop floor units. Working with the…
Former Technical College, soft strip, internal demolition, including mezzanine floors, lifts, office blocks.
Strip out and recycling, including specialist removal of a cold store and storage racking…